Aldrin

Solar Laundry • System Calculator
Off-grid planning / 48 V lithium

Sun-powered laundry.

Size a solar system around complete laundry sets. One set always contains 1 dryer + 3 washers.

01 / Your laundry

All machines run together at the entered watts for the full operating hours. This conservative estimate does not model heater cycling. Washer watts must include water heating if used.

02 / Solar & storage

03 / Inverter & generator

Motor watts are the motor portion already included in appliance watts. The starting multiplier applies only to that portion, not to dryer heating elements.

Your system estimate

How this is calculated

  1. Load: dryers × dryer W + washers × washer W.
  2. Daily energy: load kW × hours/day.
  3. Inverter: load × (1 + headroom), rounded up to 0.5 kW. Check its continuous VA rating against load ÷ power factor and verify the separate starting estimate for the required duration.
  4. Panels: round up [daily AC kWh ÷ (0.6 kW × peak-sun-hours × PV derating × inverter efficiency)]. PV derating covers array, wiring, controller and storage-path losses; it excludes inverter losses.
  5. Battery: daily AC kWh × autonomy days ÷ (DoD × inverter efficiency). Ah = nominal kWh × 1,000 ÷ 48; round up to 10 Ah.
  6. Starting estimate: running W + (starting multiplier − 1) × starting motor W. Motor W is the largest single motor or the sum of all motors, depending on your scenario.
  7. Generator: larger of [running kW ÷ (PF × target loading)] and [starting kW-equivalent ÷ PF], rounded up to 0.5 kVA. No generator transient overload credit is assumed. Starting PF may differ from running PF; this is a screening estimate.

Autonomy sizes reserve storage only. Panels replace one normal day’s energy; extra panels or generator runtime are needed to refill a depleted reserve while operating. The generator estimate supplies laundry only; add battery-charger demand and other loads separately.

Before choosing equipment

These are planning estimates, not a final installation design. Verify appliance labels, measured cycle energy, motor starting current and duration, voltage/phase, inverter kW and kVA, generator transient performance, and local solar conditions. The 500 W washer and motor defaults are adjustable placeholders.

48 V is the fixed nominal calculation voltage; many LiFePO4 products are nominally 51.2 V. Match actual bank voltage, usable energy, continuous/peak BMS current and inverter compatibility. Panel count alone does not specify MPPT voltage/current, string layout, protections or cable sizes.

Manufacturer background: Inverter selection and startup loads · Generator sizing and compatibility.

Standalone calculator • No internet connection, accounts or external libraries required.